4th Project to Be Realized With Linde Engineering Was Awarded

Fotoğraflar

RET will construct 42,000 m3 LNG tank in Vyborg/Russia, utilizing the technology of Linde Engineering.

The project is the first construction stage of Vyborg LNG plant that will have a production capacity of around 1.5 million tons of LNG per year. The investor of the project is Gazprom and Russian Peton Group was assigned as the main EPC Contractor. EPC works of LNG Tank section will be undertaken by Linde, whereas RET is selected as the main construction contractor.

RET will implement Roof Air Rising technology in this project, which is considered as a great leap forward in LNG plant construction portfolio.

Project Highlights:

Project Name: Portovaya LNG Plant

Client: Linde Engineering

Capacity: 42.000 m3

Term of Contract: 2017 – 2019

Technology: Linde Engineering

Contract Type: Lump sum

RHI’s Role: Construction Contractor


DİĞER HABERLER